What is guaranteed Maintainability?
It might seem trivial, but the best way to improve reliability is to choose equipment
that doesn't breakdown! At the very least, choose designs that when they do fail
they are easy, inexpensive and quick to fix. With the right choices in the beginning,
maintenance departments can guarantee maintainability. The field of guaranteed maintainability
was coined by Atlanta based consultant, Ed Feldman.
There are three enemy to the ability of the maintenance department to guarantee
the maintainability of a plant or facility. The first enemy to guaranteed maintainability
is buying low bid without regard for experience, specification, use or service.
Low bid specifications are seldom designed to exclude major manufacturer's models
just because they didn't perform in the past. The second enemy is mental laziness
where the maintenance people never thought through performance of the assets and
cannot identify the best brands of anything based on real data (but they do have
opinions about everything). The third enemy is time. Where maintenance has input
into the process of design it is usually a one or two day window and it might be
too late in the design cycle for changes anyway.
When designing new plants, machines or processes, for example, there are thousands
of decisions that will have an impact on maintainability.
Nine areas to consider in the design and specification of new assets
1. Access: Some factories are virtual rats nests of wires, pipes, ducts, chutes,
and machines. Access impacts maintainability. Items that cannot be easily accessed
will not be PMed. In the office of a plant in western Pennsylvania
the HVAC subsystems including the filter locations were located in 11' ceilings
above the hallways. The ceilings were drop-in tiles with no cat walks, and were
filled with wires, pipes, supports and insulation. Changing filters and lubricating
the units was a dangerous, time consuming and dirty ordeal. One of the rules of
guaranteed maintainability is to make needed maintenance easy to perform.
2. Commissioning and turn-over: How is the asset turned over to the users and the
maintenance department. When the asset is contracted for (to build a new building
or machine) the purchase documents should spell out the conditions for turn-over.
In a building, the turn-over happens when the architect's punch list is completed.
After that a warrantee period starts to allow latent defects to come to the surface.
In a machine, turn-over might be completed when the production level reaches an
agreed upon benchmark.
Consider the following as part of your turn-over process:
Documentation in an agreed upon form in the hands of maintenance department.
Video taped walk through with maintenance personnel showing all adjustments, shut-offs,
operation, etc.
Training sessions on or off site in repair, failure modes, and optimization.
Coupons for several future training sessions (we can dream, can't we?)
3. Components and parts : Are the parts needed to service the new asset the same
as the parts already in stock. Secondly, are the parts available from vendors already
known to be reliable to your company. When I computerized the delivery of products
in an oil terminal I was told by the manager that I could use any motor controllers
I wanted to as long as they were available from Square D. He had existing stock
of Square D and a great relationship with the local dealer.
In a subsidized housing development the contractor submitted (and got approved)
specs for an imported furnace as an equal to the one called for on the drawings.
At the time no spare furnaces or spare parts were bought. Two years after the property
was commissioned a unit broke down. The wait for parts was 9 months. The management
company was forced to refit the apartments with new domestic units as the imported
ones broke down.
4. Design: A manufacturer was having problems with bearing failure. He completed
failure analysis and found some of the bearings were not getting greased and others
were getting over greased. Only 1 out of 3 were getting proper greasing. He installed
an automated greasing system and eliminated bearing failure. He has incorporated
automated lubrication into his specifications for all new equipment.
Design is the most important single element of reliability. It is shocking how many
competent manufacturers don't have eliable data about failure on the components
they rely on. Your CMMS is a great source of data when the categories are set-up
correctly and the work orders are filled out and entered accurately.
5. Documentation: One of the aspects of guaranteed maintainability is the ability
to get vital information when you need it. Equipment vendors are notoriously variable
in the quality, organization and usability of their support documentation. See if
the vendor maintains a site on the Internet where you can access technical data
including parts lists, wiring diagrams, and get technical help. Web sites for maintenance
and repair are more and more common and a real bonus for you if you have Internet
access.
Lucent Technologies (formally AT&T ) now specifies how the manual and support
documentation should be constructed in their purchase orders for new equipment.
This is part of their ISO 900X process. Even if you don't go this far it is important
to make sure that the documentation will serve your needs and you will get adequate
copies.
They specify the chapters and contents of the manual:
What is the asset. What does it do, including detailed functional specifications.
Complete description of how the asset works. What are the components. What should
be done if it is not working up to specification (broken up by component). What
are the safety and environmental considerations (how can it hurt me or the environment).
6. Installation: When a contractor installs a piece of new equipment they might
not look at the long term need for maintenance(this is one area where close liaison
with the contractor that insures good maintenance techniques and standards are followed
is essential). Simple things like well positioned shut off valves, convenient disconnects,
and orientation of the unit to allow easy servicing and positioning the unit to
avoid damage from lift trucks or cranes make a major difference in your ability
to maintain the asset.
7. Skills needed to repair: When ever you change models or manufacturers there will
be a learning curve. It is important to evaluate the cost of the learning curve
and see if the change in make or model is a justifiable improvement in production
levels, reliability, efficiency, or use. In the absence of a good reason to change,
why change? Does the vendor include training and retraining as part of the new equipment
package?
8. Surfaces/finishes: This is very important for buildings and parts of machines
that come in contact with product. Some surfaces are better (last longer, are easier
to clean, etc.) than others. At Rutgers University in New Brunswick, New Jersey
specified a solid surface material such as Corian© in the dorm bthrooms instead
of tile. Solid surface material is more expensive but almost un-damageable (and
it can be repaired if it is damaged).
9. Tools: Do you have the specialized tools needed to service this new type of asset.
How much money will need to be spent for new tools. If a new class of asset is chosen
be sure the new tools are included in the budget and acquired.
Guaranteed maintainability has other aspects that are important:
1. Maintenance needs to know how to operate the equipment as well as operators.
At GE Engineered plastics, the maintenance department personnel were certified operators
at the plant.
2. Unfortunately many maintenance professionals do not have good networks of maintenance
people in other companies. Product intelligence, repair experience, re-engineering
tips, can all come from a well cultivated network.
3. If your business depends on a manufacturer's equipment, be sure to visit the
factory where the asset was built. Meet the behind the scenes engineers and shop
people. These people can become a great resource. Be sure to let then know how important
their equipment is to your operation. Bring pictures of their `babies' that you
put to work.
4. When buying new equipment use the complete life cycle cost as the cost basis
rather then the purchase price. Look at your operation, see how you need the asset
to be used, try to imagine future uses and capacity needs and pick based on the
complete picture. Assets should be purchased for the present value of their cost
stream divided by the estimated output rather then just the acquisition price divided
by the output.
5. Guaranteed maintainability requires experiments in new types of assets, new techniques
and new materials.